This $13,315,000 state-of-the-art, secure facility consolidated the 754th Electronic Systems Group (754 ELSG) Network Operations into one unified area at Maxwell AFB, Gunter Annex, AL. The building is a two story 50,849 sq ft, steel frame structure with concrete foundation and floor slab, precast walls, and raised computer floor. The facility includes a passenger/freight elevator, two stairwells, extension/upgrades of existing utilities, paving, landscaping, and installation of a new fire pump.